PxPixel
TSL Expands MediaCityUK Involvement - ProSoundNetwork.com

TSL Expands MediaCityUK Involvement

Maidenhead, UK (September 21, 2009)--Broadcast facility systems integration TSL has agreed with Peel Media Studios Limited to supply the equipment for MediaCityUK's studio technical block.
Author:
Publish date:

Maidenhead, UK (September 21, 2009)--Broadcast facility systems integration TSL has agreed with Peel Media Studios Limited to supply the equipment for MediaCityUK's studio technical block.

Image placeholder title

The new letter of intent is an addition to an earlier agreement for TSL to carry out systems integration at the new facility. Owned and operated by Peel Media, the studio block is at the heart of the £500m project and will include seven high-definition television studios, two audio studios (one dedicated to the BBC Philharmonic), and a technical block featuring fully equipped sound and vision control rooms; core post facilities; CTA (central technical area); dressing rooms; make-up rooms; workshops; set storage; and green rooms. The studios--and the facilities within the technical block--will be available for hire on a flexible, utility basis from January 2011 onwards.

TSL has been working with Peel Media for the past two years overseeing the installation and professional services for Phase 1 of MediaCityUK. The additional agreement includes the procurement of the broadcast equipment in its entirety. The technology that has and will be chosen by TSL is subject of detailed tendering processes to suppliers across the broadcast industry.

Bryan Gray, chairman of Peel Media said, "Peel Media has built an excellent working relationship with TSL, and therefore we are delighted to continue working with them, and capitalize on their expertise and knowledge to ensure successful technical fit out of the MediaCityUK studio technical block."

TSL Managing Director David Phillips said, "TSL has been working with Peel on the MediaCityUK project since its very inception and has built up a strong relationship with our client. We are delighted to have received this additional business related to this major investment by Peel. Initial pre-building of the system is already underway at our premises in Maidenhead, UK and we shall be following the detailed timeline to ensure completion of the whole program in 2010 as scheduled."

TSL
www.tsl.co.uk